A 1:1000 implementation zoning-plan amendment covering blocks 3100 parcels 2 and 4, parts of block 313 parcels 1 and 2, and unregistered land in Büyükçekmece Hürriyet is on public display from 30 October to 30 November 2026 according to the municipality’s official notice. It concerns corrections to development conditions in parts of the area and continuity of a 7-metre zoning road.
This article was prepared on 12 November 2026 after rechecking the municipal notice, the e-Government display record and the Zoning Commission report dated 8 April 2026. The commission’s favourable opinion is not final approval or display; the current stage is the municipal display that began on 30 October and ends at close of business on 30 November.
Commission opinion and public display are different stages
The proposal was referred to the commission by the Municipal Council on 6 April 2026. In its report dated 8 April, the Zoning Commission unanimously found the amendment suitable as submitted and referred it for council approval. That report alone is not an entry-into-force document. The municipality’s notice of 30 October is the later stage showing that approved sheets were placed on display under Article 8 of Law 3194; the notice does not separately state the final approval date.
Which development condition is changing?
According to the commission report, part of a building block shown as K1 Residential Area in the 1:5000 master plan remained under FAR 0.50, detached order and two-storey K2 conditions in the 1:1000 plan. The proposal corrects this part to FAR 0.80, detached order, three-storey K1 conditions in line with surrounding decisions. These values apply only within the amendment boundary and are not a district-wide floor-area increase for Hürriyet.
Why does the 7-metre road matter?
The report identifies that a 7-metre zoning road shown on the southern sheet did not continue on the relevant sheet due to a technical error. The amendment aims to restore continuity. Owners whose parcels may be affected by road alignment, corner position, frontage or dedication should not look only at FAR; they should examine the map boundary, road line, net parcel area and possible implementation procedures together.
Watershed and ground conditions still apply
The area lies partly within the Long-Distance Protection Zone of the Büyükçekmece Lake watershed. ISKI protection provisions, on-site parking requirements and the Precautionary Area 5.1 conditions in the microzonation study must be considered at project stage. The amendment does not remove these technical and environmental obligations.
What should owners do before 30 November?
First verify your current block and parcel through TKGM, then examine the amendment boundary, plan sheet, notes and explanatory report in the municipality’s online display system. Compare existing and proposed conditions, the road line and net parcel impact. If a decision adversely affects your property, submit a reasoned objection with map and document references to the competent municipal unit before close of business on 30 November 2026 and retain proof of filing.
Public display is not a permit or guaranteed gain
A displayed 1:1000 plan is important planning data, but it does not by itself create a permit, apartment count, land-for-construction sharing ratio or guaranteed economic gain. Parcel geometry, dedications, setbacks, parking, ground conditions, existing buildings and ownership must be modelled together before any binding offer. Filing an objection also does not automatically suspend the plan or create a new right.
Let us assess your parcel in Hürriyet
If you are considering renewing a building or developing land in Büyükçekmece Hürriyet, share the neighbourhood, block/parcel, current apartment and shop count, and available planning documents. Tekin Proje compares the existing plan, displayed amendment and parcel conditions from a project-development perspective; it does not guarantee additional rights, objection outcomes, sharing ratios or public support.
Official sources and dates
- Büyükçekmece Municipality — Hürriyet plan-amendment display notice
- Büyükçekmece Municipal Council — Zoning Commission report dated 8 April 2026
- e-Government — Büyükçekmece municipal zoning-plan display search
The display began on 30 October 2026 and ends at close of business on 30 November 2026. The commission report is dated 8 April 2026; sources were rechecked on 12 November 2026. Confirm the final day, parcel coverage and filing procedure with Büyükçekmece Municipality before acting.
Urban renewal consultancy in Büyükçekmece
Tekin Proje supports building and land owners considering urban renewal in Büyükçekmece with zoning pre-analysis, land-for-property project development and contractor proposal assessment.
Review the planning topic in this article alongside your parcel’s current planning documents, potential floor area and allocation options. Before choosing an urban renewal company in Büyükçekmece, let us assess your building’s potential and the scope of the proposals together.
Let Us Review Your Parcel in Hürriyet
Share the location, parcel, unit count and planning documents so we can assess the plan’s effect on your project.
Request a Parcel AssessmentSüleyman ÇİFTÇİ · Real Estate Development Specialist
Published:
Publisher: Tekin Proje, a provider of urban renewal and project development consultancy. Advice request areas are commercial contact areas. Images are illustrative and AI-generated.